Florida Office

Nav FY18 Scour Surveys

image72

  • Pittsburgh District, COE
  • 14 Sites on the Allegheny, Monongahela & Ohio Rivers
  • Multibeam Hydrographic, Side Scan Sonar, CADD Files, GIS Shapefiles, Cross Sections, geodatabase comparison to previous years
  • $165,950

South Dakota LIDAR

image73

  • NRCS/USGS/Precision Aerial Reconnaissance (PAR)
  • 4000+ Sq. Mi. in Western SD
  • GPS Ground Control on 400+ LiDAR Check Points & NGS Control, ESRI Geodatabase including XYZ values & multiple Photos at each point
  • $73,350

Big Branch NWR

image74

  • US Fish & Wildlife Service
  • Big Branch Marsh NWR - St. Tammany Parish, LA
  • Boundary Survey on 35 acres, records research, certified corner records, GPS Control, install monuments, mark and paint lines
  • $35,600

National Guard Bndy Surveys

image75

  • Alabama Army National Guard/JMR+H Architects
  • 4 sites at Range B-75 & 1 Site at Duke Field on Eglin AFB
  • Boundary/Topographic/Utility Surveys, GIS geodatabase, GPS Control, install Boundary Monuments
  • $112,250

Conemaugh Sediment Survey

image76

  • Pittsburgh District, COE
  • Conemaugh Reservior, Indiana & Westmoreland Counties, PA
  • Multi & Single beam Hydrographic, Side Scan Sonar, CADD Files, GIS Shapefiles, Digitize 1937 Original Topo Maps, Sediment Computations
  • $136,780

Mobile/Terrestrial Scans 2018

image77

  • Pittsburgh District, COE
  • Dashields, Emsworth & Montgomery Locks, Ohio River
  • Mobile/Terrestrial Scans of wall between lock chambers and river wall of river lock chamber, sub-centimeter point densities, CADD 3D Modeling
  • $133,177

Missouri Office

Cache River NWR

image78

  • US Fish & Wildlife Service
  • Cache River NWR - Jackson, Monroe, Prairie & Woodruff Counties, Arkansas
  • 13 Boundary Surveys of varying acreages from 2012-2017, records research, certified corner records, GPS Control, install monuments, mark and paint lines
  • $338,750

Mark Twain National Forest

image79

  • US Forest Service
  • Mark Twain National Forest - Willow Springs District (2016-2018)
  • Dependant Resurvey of ±25 miles of USFS Boundary Lines, records research, certified corner records, GPS Control, install monuments, mark and paint lines
  • $192,500

Dollar General Sites 2017

image80

  • The Overland Group
  • Numerous Sites across Missouri
  • Preliminary Boundary/Topographic Surveys on 26 Sites, ALTA & Post Construction Asbuilt Surveys on 16 sites chosen for design. Surveys performed using GPS and/or Robotic Total Stations.
  • ±$75,000

Keystone Lake LiDAR Support

image81

  • GRW/St. Louis COE
  • Keystone Lake - Creek, Osage, Pawnee, Payne and Tulsa Counties, OK
  • Survey Suport, location of 28 LiDAR Calibration Control Points and 13 various existing NGS Control Points, RTK Site Calibration, Survey Report
  • $7,150

Cheney Reservoir Multibeam

image82

  • MKEC Engineering
  • Cheney Reservoir - Kingman & Sedgwick Counties, KS
  • Multibeam Hydrographic Survey, Data Collection of more than 10,000' of the face of the Dam, deliverable was xyz file on 1 cm grid, detailed Survey Report
  • $6,550

Landfill Boundary & Topo

image83

  • City of West Plains
  • Old City Landfill Site, County Road 1770, Northern West Plains
  • Boundary & Topographic Survey on 90 acres, Survey performed using a Robotic Total Stations, GPS and a Remote Controlled-Fixed Wing Drone
  • $15,500